We all know one of the most popular materials of flooring is tile. Tiling may seem an easy thing, but in reality, it includes a lot of planning that is highly important for decorative appeal, installation, versatility, and long-lasting life.
Following this, you should hire the best tiles contractor Singapore because it will impact all over your house or space.
However, a step-by-step guide, preparations, and planning can make things quite easier for you. Here is a step-by-step guide that can make tiling an easy task for you.
1. Surface Preparation:
This is the first step you need to follow for the tile installation process is to prepare the surface. The surface where you need to put tiles should be clean, smooth, and dry. It is essential because it will end up giving you the best results. Before beginning the tiling work, make sure to take time for repairing, patching, and leveling any of the damaged or uneven parts. You need to double-check to assure that the surface you need to put tile on should be sound and the entire area has no soap scum, grease, or wax.
Also, you need to remove the moldings, trim, and appliances that can interfere with the tile installation. Check on the doorjambs to ensure that the tiles are clear getting installed on the floor. Identifying in advance of these potential complications is a great help to install tiles smoothly.
Tiling contractor Singapore prepares your surface in the best possible way.
2. Floor Layout:
A good floor tile totally depends on how the layout is done and the straightness of the lines. Use chalk lines and snap lines with the intersection of 90-degrees at the center of the room. Keep in mind that sometimes according to the configurations of the room, you cannot achieve that and need to follow a different approach. Make sure to follow the layout and install tiles loosely with the spacers with the walls. Begin with intersecting the chalk lines and make a path that forms a 90-degree angle with the tile. If you notice the gap between the last tile and the wall is more than ½ tile, you need to adjust the tiles to one or another side.
You can proceed further if you and your customers are satisfied with the layout.
3. Adhesive Application:
That’s the most general rule that you need to be mindful of is to mix the amount of adhesive that is enough to get finished within 30 minutes. The adhesive package mentions using the flat side of the trowel type, spread a1/4 inches of the coat on the surface of one grid area but doesn’t cover the guidelines.
After that, you need to hold the trowel at a 45-degree angle and take the notched side for combing the adhesive into the ridges. Leave behind a uniform when you need to remove the excessive applied adhesive.
4. Cut Tile if Needed:
Begin with marking to the measured lines that will get with a pencil or felt-tip pen on the surface of the tile. There is also a tile cutter that you can use to achieve pointed straight or diagonal cuts. For best results, use nipper using masterful curved cuts that chip away small pieces.
5. Setting Your Tile:
After preparing the surface, creating a tile layout, applying adhesive, and cutting the tiles now, you are ready to do the actual installation of your tiles. Begin with installation of tiles in between the room and install at one grid at a time. Make sure to complete each grid before going to the next. Each grid will help you to start from the first tile in the corner and then work outward.
With the slight twisting motion, you can set tiles one at the moment and do not slide them into the place. Make sure to insert spacers for set tiles or leave equal joints in between the tiles. For last, save the perimeter tiles in each of the grid and leave 1/4th inches of gape between tiles and the wall.
As the grid is installed, use a rubber mallet for tapping in all tiles, or you can use a hammer and wood block to assure a potential bond with the level plane. Remove all the excess adhesive from the joints using a putty knife and use a damp sponge on the tile to prevent all the uneven appearance.
At last, let your hard work sit for at least 24 hours before you start walking on it. The tiling contractor Singapore gets done all your work with perfection to make you have smooth flooring.
6. Grouting Joints:
Once your tiles are in place and already set for 24 hours, so your last step is to grout. Or you can fill the joints and consolidate the entire floor into one solid mass.
You will get a grout package; read all the instructions and precautions carefully. After that, make just the amount that gets finished in 30-minutes of time. After removing the tile spacers, spread the grout on the tile surface. You should use a rubber grout float to force it down on the joints of the floor.
Final Words:
This is the method for installing the tiles on your floor. The best tiles contractor in Singapore uses these steps to complete the process of tiles installation and end up giving you the best results.